EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
JMillette
-
Listing for Category : fuel system
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (142)
Research
- (3)
-
Purchase of Full Kit...
-
Purchase of Tail Kit
-
The journey begins...
Workshop
- (3)
-
Clean up day
-
New lighting
-
Prep for A/C install...
Empennage
- (4)
-
Elevator pulleys
-
Continued working...
-
Side Walls and Top
-
Empennage Build started
Fuselage
- (19)
-
Electrical redo
-
Passenger Door
-
Final Fitting of...
-
Final Assembly of...
-
Pilot Door Final...
-
Painted Door frames...
-
Passenger side door
-
Sunroof Install
-
Installed windscreen
-
Built Pilot Door
-
lower cowl install
-
Completed paint of...
-
Tie downs and Cargo...
-
Upper front skin
-
Continued front...
-
Fuselage Continued
-
Joined the Fuselage
-
Corrected the mistake
-
Started work on the...
Firewall
Tail Feathers
- (15)
-
Contiued mounting...
-
Reskinned the Elevator
-
Stabilizer end cap
-
Finished up the Dorsal
-
Dorsal Fin and...
-
Mounted Tail
-
Vertical Stab
-
Completion Elevator
-
Started assembly of...
-
Completion on the...
-
Horizontal...
-
Horizontal...
-
Tail Kit Arrived and...
-
Completion of rudder...
-
Rudder Trial Fit
Wings
- (25)
-
Riveted wing tips
-
Reinstalled Wings...
-
Disassembly
-
Fairings
-
Fiberglass Fairing
-
Inner wing skins
-
Completed wiring in...
-
Riveted wing tips
-
Root Wing Skin
-
Completed wiring in...
-
Pilot Wing tip
-
Corrected dihedral
-
Struts and mounting...
-
Mounted wings
-
Left wing Completed
-
Left wing wire
-
Left wing debur and...
-
Left wing bottom skin
-
Started left wing
-
Completed wing tip...
-
Continued right wing
-
Right Wing
-
Started skeleton of...
-
Wings right Started...
-
Right wing continued
Controls
- (7)
-
Installed Flaperons
-
Flaperons
-
Building of Flaperon...
-
Parking Brake
-
Steering Linkage
-
Mocked up Rudder...
-
Mocked up...
Avionics
- (11)
-
CB Wiring
-
Panel and Electrical...
-
Panel option redue
-
Clean Slate
-
Radio installed
-
Radio installed
-
Mount for Headsets
-
Static System/BU...
-
Started wiring the...
-
New removable panel...
-
Received GRT...
Lighting
- (3)
-
Wiring from Wing to...
-
Installed Pilot...
-
Installed Landing...
Instrument Panel
- (7)
-
Batterys
-
Mounted new panel...
-
Cut out new panel.
-
EIS Sensor Terminal
-
Hobbs meter and Flap...
-
Switch panel and...
-
Panel Completed
Landing Gear
- (6)
-
Nose Strut Spacer
-
replaced the nose strut
-
Brake line covers
-
Nose Gear and Brakes
-
On the Gear
-
Painted Landing gear
Engine
- (14)
-
Cowl Continued
-
First Start of...
-
Electrical of...
-
Electrical...
-
Cowl Work
-
Engine Install:...
-
Engine install:...
-
Engine install:...
-
Corrected Radiator...
-
Radiator Plumbing
-
Installed engine...
-
Engine Install:...
-
Engine Unboxing
-
Ordered Eng. and...
Propeller
- (1)
-
Chip in prop
Fuel System
- (7)
-
Reconnected fuel lines
-
Re did fuel channels
-
Fuel tanks and fuel...
-
Viking Aircraft Fuel...
-
Fuel Trailer
-
Installed header tank
Interior Finish
- (3)
-
Color Scheme
-
Painted and...
-
installed sliding seats
Paint / Decals
- (11)
-
Decals Installed
-
Painted both wings
-
Painting Tail feathers
-
Made Decals for air...
-
Painted Glare Shield...
-
Primed and Painted...
-
Decals
-
Painted Exterior Trim
-
Prepped for paint...
-
Printed decal tests
-
Painted the interior
Inspection
Tools
- (1)
-
Building Fuel Trailer
Auto Entry
- (1)
Farings
- (1)
-
Farings
Builder Name:
Joseph Millette
-
Project:
Zenith
-
VIEW REPORTS
Total Hours:
1151
Total Flight Time:
Start/Last Date:
Jul 30, 2020 - Mar 31, 2022
Engine:
Viking 130
Propeller:
Whirlwind
Panel:
GRT 10.1 Sport
Friendly URL:
https://eaabuilderslog.org?s=JMillette
Home or Last Project Picture
Dec 04, 2022
Reconnected fuel lines
- (8 hours)
Category: Fuel System
Reconnected fuel lines from wing to fuselage. Made aluminum plates for access panel
38B9010A-8461-4A4C-B46D-A8D44EAFCF75.jpeg
81792D83-D98C-4E96-AF6E-3E369EFB5E01.jpeg
Oct 30, 2022
Re did fuel channels
- (8 hours)
Category: Fuel System
Removed headliner material, cleaned off glue and primed and painted. I wrapped fuel line with silicone heat protection tube for chaff protection. Labeled fuel nipples on fuselage, replace rubber grommets with plastic snap ring and re secured.
6FBBA6E2-3190-4EBF-A8F2-F08A19716F44.jpeg
154C5BCD-B707-4789-8750-F67E6179449E.jpeg
1D390888-C7D8-46B9-AB83-B937F68A54D8.jpeg
01EBB349-D0F9-4810-8BF2-9138BF509B45.jpeg
E8B4795E-C33F-4A6A-876F-C3EDE25C755F.jpeg
5584A913-44B6-4496-BF3F-C3E89437F7E1.jpeg
Mar 27, 2022
Fuel tanks and fuel line
- (8 hours)
Category: Fuel System
Completed routing fuel line from main wing tanks to the header tank. Few more holes to drill and will be fully set up and ready for testing for leaks.
IMG_4226.jpg
IMG_4227.jpg
IMG_4228.jpg
IMG_4229.jpg
IMG_4230.jpg
IMG_4231.jpg
Mar 25, 2022
Viking Aircraft Fuel Sender
- (16 hours)
Category: Fuel System
Installed the fuel sender inserts from Viking Aircraft Co. they are ~1in lower allowing for installation of the fuel senders on the top of the tank.
IMG_4209.jpg
IMG_4215.jpg
IMG_4216.jpg
IMG_4217.jpg
IMG_4218.jpg
IMG_4222.jpg
IMG_4223.jpg
IMG_E4210.jpg
IMG_E4213.jpg
IMG_E4214.jpg
IMG_E4219.jpg
IMG_E4220.jpg
Mar 12, 2022
Fuel Trailer
- (3 hours)
Category: Fuel System
IMG_4152.jpg
IMG_4153.jpg
IMG_4154.jpg
IMG_4155.jpg
Jun 27, 2021
Installed header tank
- (8 hours)
Category: Fuel System
2D0CE4FF-8BF8-4F9C-BA34-A51BECD52E0B.jpeg
DC8B32FE-7718-4B11-ADE5-9DE3AFE00110.jpeg
C26E28B8-7CED-4695-B3C8-104509D7230A.jpeg
828A5395-E501-4AF6-86D2-B35F92CB8D8A.jpeg
8F2189EE-7FEF-4F9D-8548-1BD235DDF82A.jpeg
EB185B59-6B21-4091-934F-FBF08E574345.jpeg
8728633B-FFFC-4DE0-8738-EDB1787D298C.jpeg
6A0D1C70-F2A4-46E8-8632-46A6EE76743F.jpeg
FE65984D-8ED1-4FFE-86D2-70FE0EB46558.jpeg
6D45A90E-47B8-4D8C-A268-8CEC9A12A831.jpeg
1D91AA28-C5D8-4B87-A3B1-41247D676407.jpeg
4B1FDDD7-C101-434F-8200-C3AF50A5E862.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.